How Long Does a 5x8 Bathroom Remodel Take? A Complete Guide
Toilet Repair

Remodeling your bathroom is one of the most impactful ways to upgrade your home—but how long will it actually take? When you’re planning a renovation, especially for a common layout like a 5×8 bathroom, knowing what to expect can make all the difference. The timeline affects not only your budget and daily routine but also when you’ll get to enjoy the finished results. At Cottrell Plumbing, Heating & Air, we know timing is crucial. This guide will walk you through how long a 5×8 bathroom remodel takes and what factors play into that schedule, so you can start planning with confidence.

What Is a 5×8 Bathroom? Understanding the Layout and Scope

A 5×8 bathroom, or 40-square-foot space, is the most standard size for full bathrooms in many homes. This compact layout typically includes a toilet, a single sink, and either a bathtub or a combination tub/shower. While the space may be small, the remodeling process still involves multiple trades—plumbing, electrical, tile work, drywall, and cabinetry—which means strategic planning is essential. Because it’s a confined space, remodeling a 5×8 bathroom presents unique opportunities and challenges. On the one hand, smaller space means less surface area to tile and fewer materials to install. On the other, tight spaces can make labor more complex and time-consuming. Understanding the limitations of this layout will help set realistic expectations for your remodeling timeline.

Average Timeline: How Long Does a 5×8 Bathroom Remodel Take?

So, how long does a 5×8 bathroom remodel take? On average, it ranges between 2 to 4 weeks for a full remodel, assuming you’re working with a licensed professional like Cottrell Plumbing, Heating & Air. The timeline depends largely on the complexity of the project:

  • Basic Remodel (2–2.5 weeks): Includes new fixtures, a fresh coat of paint, and flooring or tile upgrades without altering plumbing or electrical layouts.

     

  • Mid-Range Remodel (3 weeks): Involves replacing the tub, updating the vanity and toilet, installing new tile, and minor plumbing or electrical upgrades.

     

  • Full Remodel (3–4+ weeks): Includes complete demolition, relocation of plumbing or electrical systems, structural adjustments, and high-end finish selections.

     

Breakdown by Project Phase: A Week-by-Week Overview

Here’s a general week-by-week breakdown of what a typical 5×8 bathroom remodel might look like:

Week 1: Demolition & Rough-In

  • Remove existing fixtures, cabinetry, tile, and drywall.
  • Complete plumbing and electrical rough-ins for new fixture locations.
  • Schedule inspections if required.

Week 2: Structural Work & Surface Prep

  • Repair or replace damaged subflooring or drywall.
  • Install moisture-resistant drywall and prep surfaces.
  • Begin tiling floors and shower walls.

Week 3: Installation of Fixtures & Cabinets

  • Install vanity, toilet, bathtub/shower.
  • Complete tile work and grouting.
  • Install lighting, ventilation fans, and mirror.

Week 4: Final Touches & Cleanup

  • Final plumbing and electrical connections.
  • Paint touch-ups, caulking, and sealing.
  • Thorough cleaning and final inspection.

Note: Unexpected issues like mold, subfloor damage, or delays in material deliveries can extend the timeline.

Factors That Can Speed Up or Delay Your Bathroom Remodel

Several key factors influence the timeline of a 5×8 bathroom remodel:

Accelerators:

  • Pre-selected materials and finishes
  • Prefabricated vanities or shower kits
  • Working with a licensed, well-coordinated contractor
  • Clear communication and on-time approvals

Potential Delays:

  • Custom tile or cabinetry orders with long lead times
  • Permitting issues or inspection delays
  • Discovery of hidden problems (e.g., water damage or outdated wiring)
  • Change orders mid-project

Proper planning and working with experienced professionals can help mitigate delays and keep your remodel on track.

DIY vs. Professional Remodels: How Timelines Differ

While DIY remodels may seem appealing for cost savings, they often take significantly longer—sometimes double or triple the time of a professionally managed remodel. DIYers typically work on weekends or evenings, may lack the tools and experience needed to handle plumbing and electrical work efficiently, and can be subject to permit rejections or rework.

In contrast, hiring professionals like Cottrell Plumbing, Heating & Air means your project is handled by trained specialists who can streamline the workflow, coordinate inspections, and manage subcontractors efficiently. Professional remodels not only save you time—they also reduce stress and ensure code compliance.

Real-Life Timelines: What Homeowners Are Experiencing Today

Here are a few real-world examples from our customers in West Columbia and surrounding areas:

  • Basic Remodel (12 days): A client wanted to update their fixtures, retile the floor, and repaint. The project was completed ahead of schedule in less than two weeks.
  • Mid-Range Remodel (3 weeks): We removed a dated tub and installed a walk-in shower with new tile and lighting for a retired couple. The project was completed within 21 days.
  • Full Remodel (4.5 weeks): A growing family needed additional storage, a new vanity, plumbing rerouting, and custom tilework. The custom cabinet delay extended the project to just over a month.

Your timeline will depend on your goals, your budget, and how much customization you desire.

Pro Tips to Stay on Schedule During Your Remodel

Want to keep your remodel on track? Follow these pro tips:

  • Plan early: Make all material and fixture selections before work begins.
  • Hire a full-service contractor: This eliminates miscommunication between trades.
  • Avoid changes mid-project: Alterations during construction can cause significant delays.
  • Stay available for questions: Prompt approvals and decisions keep the process moving.
  • Ensure access to the workspace: Clear the area before your contractor arrives.

At Cottrell Plumbing, Heating & Air, we prioritize communication and project management to keep things on time and within scope.

When to Hire a Pro: Choosing the Right Contractor

Hiring a qualified contractor for your 5×8 bathroom remodel isn’t just about finishing fast—it’s about getting the job done right. Look for a contractor with:

  • Proven experience with small bathroom layouts
  • Licensing and insurance
  • Local references and project photos
  • Transparent pricing and written timelines
  • Full-service capabilities (plumbing, HVAC, electrical, remodeling)

Cottrell Plumbing, Heating & Air brings years of remodeling experience to West Columbia and surrounding communities. We handle every detail so you don’t have to juggle multiple trades or worry about delays.

Conclusion

So, how long does a 5×8 bathroom remodel take? The answer depends on your goals, materials, and who you hire—but on average, you can expect 2 to 4 weeks for a complete remodel when working with a professional. With proper planning and the right team, your bathroom renovation can be a smooth, stress-free process that delivers lasting comfort and value.

Ready to find out exactly how long your remodel will take? Contact Cottrell Plumbing, Heating & Air today for a free consultation. We’ll review your space, understand your goals, and provide a custom quote and timeline so you can start planning with confidence.